PROJECT OVERVIEW

This project focused on a full bathroom renovation for homeowners who had previously worked with Collaborative Construction on a basement renovation and returned based on their positive experience. The goal was to refresh the space while solving functional challenges, including freezing plumbing along an exterior wall and inefficient use of a tight layout.

The scope included removing the old tub, installing a new tub, adding heated floors, upgrading tile throughout the floor, shower, and vanity wall, and incorporating custom shelving and storage into underutilized areas. A heavy client supplied vanity was installed, and thoughtful design details were added to elevate both form and function.

Planning a bathroom renovation?

CLIENT TESTIMONIAL

“The communication was the best part of the whole process. We were able to stay almost in real-time contact, get updates and options quickly, and trust the team to move things forward even when decisions had to be made fast.”

– Jackie & Gord (homeowners)

PROJECT WALKTHROUGH

“We focused on using every part of the space efficiently. Even with limitations like existing plumbing and a smaller footprint, we found thoughtful solutions—custom shelving, repurposed materials, and details that added both function and character to the bathroom.”

– Donny, Project Manager (Collaborative Construction)

OUR APPROACH

The team took a communication first, problem solving approach, keeping the homeowners informed in near real time while work was underway and providing clear options whenever decisions needed to be made quickly. When hidden challenges emerged, including plumbing and insulation issues behind the exterior wall, the team proactively adjusted the structure, spray foamed for insulation, and explained the fixes before moving forward. Special care was taken to handle and install the extremely heavy vanity, repurpose the supplied backsplash piece into a custom shower niche, and design built in shelving for a previously awkward storage area. Throughout the project, the team focused on using every inch of the space efficiently while maintaining a high standard of craftsmanship.

PROJECT OUTCOME

The finished bathroom delivered a dramatic upgrade in both comfort and usability, with heated floors, refined tilework, and custom shelving that maximized storage in a small footprint. The tiling, drywall, and paintwork stood out for their precision and attention to detail, while the new layout resolved long standing freezing issues and improved overall flow. The homeowners were especially impressed by the team’s responsiveness, creative problem solving, and willingness to go above and beyond, from weekend fixes to handling heavy installations. The result is a beautifully finished, highly practical bathroom that exceeded expectations and reinforced the homeowners’ trust in Collaborative Construction for future projects.

GALLERY

RELATED PROJECTS

A full main floor kitchen renovation designed around a show stopping oversized island that delivered a warm, open, and inviting space that exceeded the homeowners expectations.

 

A full main floor renovation that transformed the kitchen and living room into a more open, functional, and beautifully detailed space anchored by a new oversized island and a reimagined fireplace feature.

 

A full kitchen renovation that opened up the main floor with a removed wall, a massive island, new windows, refinished hardwood floors, and a bold three tone cabinetry design.

READY TO START YOUR RENOVATION?

Tell us about your project and get personalized recommendations from our team.